Woodland Hills · Est. 2013

Plans drawn. Permits approved.

Drawings, permits, and plan-check corrections — handled, for homeowners and contractors across Greater LA.

If it doesn't need a permit, we'll say so.

A-1.0Why permits stall

Projects don't stall on the job site. They stall at the counter.

01

Drawings the city won't accept

Incomplete sets get rejected, and every rejection costs weeks. We draft to your city's own checklist.

02

Every city has its own rulebook

Setbacks, energy code, submittal formats — all different by city. We know which counter wants what.

03

Nobody owns the follow-up

Applications sit unless someone chases them. That's the expediting half of what we do.

Sound familiar?

Tell us where your project is stuck.

If it doesn't need a permit, we'll say so.

A-2.0How it works

Four steps, from idea to issued permit.

  1. 01Step one

    Consult & measure

    We check what your city requires, quote the job, and measure the site.

    Fixed scope and quote

  2. 02Step two

    Design & drawings

    We produce the full permit set, with licensed engineers where structure calls for them.

    Permit-ready plan set

  3. 03Step three

    Submittal & expediting

    We file with the city and keep the application moving through review.

    Application in review

  4. 04Step four

    Corrections to approval

    We answer plan-check comments and resubmit until the permit issues.

    Issued permit

Architectural floor plans and drafting tools on a work table, in dark blueprint tones
On the public record5facts · verifiable
  • 01
    2013
    In business since
    Incorporated October 25, 2013
  • 02
    C3614811
    California corporation
    Active · good standing
  • 03
    23
    Permitted projects
    ≈ $873K in recent years, per public permit records
  • 04
    5
    Counties permitted in
    LA · Orange · Ventura · San Bernardino · Riverside
  • 05
    12+
    Years at it
    Based in Woodland Hills, CA

Every figure is from the public record — the CA Secretary of State and city permit databases.

2013
Incorporated
C3614811
CA corporation, active
5
Counties permitted in

Who you're hiring

Twelve years of plans, permits, and plan-check letters.

One job since 2013: getting projects from idea to issued permit. All of it on the public record.

A-4.0Questions

Asked before people send the address.

01Do I need a permit for my project?

If it touches structure, plumbing, gas, electrical or the footprint — almost certainly. Like-for-like finish work usually doesn't. Asking us is free.

02How long does plan check take?

Depends on the city, season and scope — anyone quoting a number without knowing all three is guessing. We'll tell you how your city is actually running.

03What are plan-check corrections?

The city's comment list after review. Nearly every application gets some; answering them fast is the biggest timeline lever anyone controls.

04Can you legalize unpermitted work?

Usually — as-built drawings, a permit application, and whatever corrections the city requires. Far better done on your schedule than during escrow.

05Do you do the construction too?

No — we draw and permit; a licensed contractor builds. That split is by design.

Your city

Every city is different. We'll tell you what yours requires.

If it doesn't need a permit, we'll say so.

Start with the drawings, or start with a question.

Send the project and the address — we'll reply with what it needs and what it costs.

If it doesn't need a permit, we'll say so.